Leaders in Spain’s renewable energy industry have indicated that after years of rapid capacity growth, the priority for 2026 is to stimulate electricity demand and establish a clear regulatory framework for energy storage to ensure the sustainability of the energy transition.
According to data from Red Eléctrica Española (REE), Spain’s electricity demand increased by 2.7% in 2025, with the annual total reaching 255,759 GWh. Industry experts believe that while this growth trend is positive, it still requires deeper, structural support from consumption.
Executives from Acciona Energía, ENGIE, Saeta Yield, and FE Energy expressed a consensus at the APPA Renovables annual conference, agreeing that electricity demand must align with renewable generation to maintain the long-term economic viability of the system.
Electricity Demand Growth Trend
In December 2025, Spain’s total electricity consumption was 22,582 GWh, a 2.6% year-on-year increase, which rises to 4.2% after adjusting for temperature and working days. Self-consumption already accounts for nearly 3% of the total monthly demand, showing the initial success of the electrification process.
Industry leaders stressed that Spain has abundant renewable resources, mature technology, and strong investment appetite, but needs policies to promote broader electricity use in sectors like industry to form a stable demand base.
Electrification as a Core Strategy
Álvaro Pérez de Lema, representing Acciona Energía, stated: “We need demand to flow through the system. Renewable generation is in place, but it must be matched by sustained, structural consumption.” He also highlighted the central role of storage in the transition.
Daniel Fernández Alonso, head of ENGIE Spain, suggested stimulating industrial electricity consumption by adjusting market signals without needing structural reforms. Arantza Ezpeleta of Saeta Yield believes that electrification should be at the core of Spain’s energy strategy.
Storage Projects Significantly Exceed Targets
Currently, the capacity of submitted energy storage projects exceeds 40 GW, far higher than the 13 GW target set in the National Integrated Energy and Climate Plan (PNIEC). As solar and wind power continue to expand, the industry is calling for clear system planning, grid access, and remuneration mechanisms to enhance grid flexibility.
Alberto García Feijóo of FE Energy emphasized that renewable energy expansion needs to be combined with firm demand, stable contracts, and long-term visibility to support investment returns.
A Decisive Two-Year Window
Industry experts unanimously agree that while Spain’s energy transition is on the right track, the next two years will be a critical period for consolidating a balanced and resilient energy model. Accelerating electrification, improving the storage regulatory framework, and creating attractive economic conditions for long-term investment will directly impact the achievement of the 2030 climate and energy goals.