Reservoir Discharges Cause Rising Levels in Two Rivers
The Madrid City Council is closely watching the water levels of its two main rivers, the Manzanares and the Jarama. As revealed by the Deputy Mayor and Delegate for Security and Emergencies, Inmaculada Sanz, on February 5, the Manzanares River has seen a significant rise as it passes through the Puerta del Hierro area. The primary cause of the rising levels is controlled discharges from upstream reservoirs. According to data from the Tagus River Basin Confederation (Confederación Hidrográfica del Tajo), the El Atazar reservoir is releasing water at a rate of approximately 25 cubic meters per second, while the discharge from the Santillana reservoir is about 15 cubic meters per second.
Red Alert Activated for Section of Jarama River
The situation is most critical along the Jarama River. Since Wednesday, February 4, the stretch from Mejorada del Campo to San Fernando de Henares has been under a red alert, the highest level. As a precaution, Municipal Police temporarily closed a pedestrian bridge over the Manzanares River in the El Pardo area on Wednesday to prevent any potential risks. Deputy Mayor Sanz has repeatedly stressed that citizens should stay away from areas near the river and pay close attention to the latest official information.
Authorities Urge Public to Be Wary of Dual Risks
Although Sanz stated there is “no immediate risk at present,” she urged the public to maintain a high level of caution. In addition to the flood threat, the State Meteorological Agency (AEMET) has issued a high-wind warning for Madrid, with gusts of up to 80 km/h expected from 6 p.m. on February 5. This combination of risks requires citizens to take extra precautions. The city government has indicated it will continue to monitor rainfall and further discharge plans from the reservoirs to determine if a higher-level emergency plan needs to be activated.

Historical Flood Control Challenges in Rivas Area
Madrid’s Mayor, José Luis Martínez-Almeida, has turned his focus to historically flood-prone areas, especially Rivas-Vaciamadrid. This district is at higher risk due to its limited drainage system capacity and an ancient underground stream channel. Notably, after record rainfall in March 2025, the city council proposed the construction of a third major sewer collector to address this long-standing issue. The project, initially owned by the Ministry of Transport, was later transferred to the city council, but no new construction progress has been publicly announced to date.