Chinese auto giant SAIC Motor has officially selected the Ferrolterra region in Galicia, Spain, as the site for its first European car factory. According to official statements from SAIC’s MG brand and the Regional Government of Galicia, the project has been designated a “Strategic Industrial Project for Galicia,” highlighting its importance to the regional economy.
Initial Investment and Construction Plan

According to the President of the Regional Government of Galicia, Alfonso Rueda, SAIC’s initial investment in the first phase of the project will be €200 million. Construction of the factory’s infrastructure is scheduled to begin in 2027, with the goal of starting commercial operations by the end of 2028.
The production base will feature a divided layout, with the main vehicle assembly plant located in the outer port of Ferrol and the parts base in the nearby town of As Pontes. Once operational, the project is expected to create approximately 2,300 direct and indirect jobs throughout the province, providing a significant boost to the local economy.
Production Model and Capacity Goals
The new factory will primarily produce MG brand models. Production will use the Completely Knocked Down (CKD) assembly model, where vehicle parts are manufactured in China, shipped to Spain, and then assembled into complete vehicles at the local factory. This model helps optimize the global supply chain and facilitates local production.
In terms of capacity, the factory plans an initial annual output of 60,000 vehicles starting in 2028, with plans to steadily increase annual capacity to 120,000 units within the first phase of development. This move is set to have a profound impact on the new energy vehicle industry landscape in Spain and Southern Europe.
Key Logistics Test Underway
To ensure the smooth operation of the future large-scale maritime logistics chain, SAIC has initiated an assessment of the Port of Ferrol’s infrastructure capacity. Its subsidiary, Anji Logistics Co., has dispatched a massive roll-on/roll-off (Ro-Ro) car carrier named “Anji Forever” to conduct the first on-site test mission.
The ship, built in 2025, is 228 meters long and can carry 9,500 standard car equivalent units (CEU). According to vessel tracking data, the ship departed from the port of Lianyungang, China, on June 1st and is expected to arrive at the Port of Ferrol on July 8th. Upon arrival, it will conduct a comprehensive practical drill to test the port’s ramp unloading, transfer processes, and storage yard capacity, providing crucial data to support the project’s subsequent phases.