Spain’s National Commission on Markets and Competition (CNMC) has recently made a final ruling on the much-debated issue of cost allocation for the national blackout of 2025. The agency has decided that the costs required to restore the power system will not be covered by the national budget nor borne solely by Spain’s national grid operator, Red Eléctrica. Instead, they will be shared among all electricity consumers and retailers through the electricity tariff mechanism.
Cost-Sharing Plan: A Slight Increase in Electricity Bills for the Next 12 Months
According to CNMC’s calculations, the total cost to restart the grid and restore power after the nationwide blackout on April 28, 2025, was approximately €38.7 million. After deducting the €9.1 million already settled, a deficit of €29.6 million remains to be covered.

To avoid a significant financial impact on consumers from a one-time levy, the regulator has decided to spread this cost over the electricity bills for the next 12 months. The distribution will be calculated based on each user’s actual electricity consumption. Officials estimate this additional charge will amount to €0.12 per megawatt-hour (MWh). While the monthly increase for an average household will be modest, this fee will apply to all electricity customers nationwide.
Controversy and Ruling: Why Not Use the National Budget?
Before this resolution was issued, 16 organizations, including electricity industry associations, consumer groups, and several retailers, had filed a joint appeal. They argued that the blackout was an exceptional event of force majeure, and its recovery costs should be covered by the national budget rather than being passed on to consumers.
However, the CNMC responded in its ruling that, under the current legal framework, the commission does not have the authority to use the national budget or fundamentally alter the existing fee structure to cover such special costs. Therefore, allocating the cost through electricity tariffs is the only viable option within its jurisdiction.
Grid Recovery Details: Gas and Hydro Power as Key Restart Sources
The report detailed the grid recovery process following the blackout. The restart relied mainly on combined-cycle gas turbine (CCGT) power plants and hydroelectric power plants, with additional support from cross-border electricity from France.
In the total cost breakdown, the recovery costs from gas-fired generation accounted for the largest share, approximately €26 million, while hydroelectric power costs were about €5.9 million. The CNMC specifically emphasized that during the final compensation calculation, it rejected high-priced bids submitted by some power generation companies. The compensation was strictly determined based on a series of objective criteria, such as natural gas market prices, carbon emission costs, and equipment operation and maintenance fees, to ensure the reasonableness of the costs and prevent the recovery expenses from being artificially inflated.