The Spanish National Competition Regulatory Authority (CNMC) has formally initiated a discussion on the economic structure of the power system. In its latest official monitoring report, the CNMC disclosed that on July 27, 2026, it formally requested Red Eléctrica de España (REE) to conduct a comprehensive study aimed at assessing the allocation method for costs associated with technical restrictions imposed on electricity demand.
As challenges facing the power system increase, this study will help determine how to reasonably share the ‘high’ costs of anti-blackout operations. This move marks an important step for Spain in seeking a balance between ensuring stable electricity supply and equitable cost sharing. The CNMC hopes that through this study, a more rational electricity cost distribution mechanism can be established, ensuring the sustainable operation of the power system.