The Spanish Ministry of Transport announced that to ensure the proper operation of the upcoming ERTMS Level 2 signal system, train operations on the Madrid to Seville high-speed line will be adjusted with a temporary reduction in the number of trains. This measure aims to increase safety distances between trains and prevent incidents similar to the collision that occurred on October 28 near Urdal (Toledo). In that accident, 69 people died due to faults in the German LZB signaling system currently in use. Transport Minister Óscar Puente indicated that this adjustment will continue until the new signal system is officially operational, expected earliest in early 2027. The new system will replace the LZB system, which has been phased out due to technological limitations since its deployment on the southern corridor in 1992. This move reflects the necessity of ensuring railway safety, with authorities actively working to deploy the ERTMS system for safer and more efficient future rail operations.