On November 20, 2026, Spain’s Ministry of Transport announced that the Madrid-Seville high-speed rail line, which was closed due to a train collision in Ulda on October 28 resulting in 69 fatalities, is expected to be repaired within two weeks. The disaster led to a complete suspension of railway services, pending further damage assessment before repair work could commence.
The technical team from Adif has recently entered the accident site to evaluate the damaged tracks, signal systems, and cables. Although repairs are scheduled to be completed within the next two weeks, full service recovery is unlikely before the December holiday period. Currently, high-speed rail operators such as Renfe, Iryo, and Ouigo have halted ticket sales until December 13.
Post-accident, multiple railway safety measures are being reevaluated and planned for implementation to prevent similar incidents in the future. The Ministry reports that the new ERTMS signaling system is in final testing stages to ensure safety and reliability before deployment, expected in early 2027, replacing the existing Hena system. This incident marks the second major accident on the Madrid-Seville line within ten months, prompting a comprehensive review of the railway system.